|
|
Caterpillar Side Booms – Advantages and Disadvantages |

|
Side Boom braking systems – High track and conventional |
|
Side Boom tractors - associated hazards |
 |
Side Boom Operator evaluation test |
 | Side Boom Operator – Extreme Slope Coaching |
 | ROW H & S Weekly Verification Inspection |
 | Working Safely Underneath overhead powerlines |
 | Prep Shavings Management |
 | ATV Use |
 |
|
|
 |
 |
Blasting - Transport of Explosives |
 |
Brown recluse - Tegenaria Agrestis - spider and hazards to the worker
|
 |
Carbon Monoxide at the worksite |
 |
Chain Saw - Safe Use Practices |
 |
Coating hazard assessment |
 |
Confined space entry - where and when on a pipeline project |
 |
Crew Safety Meeting Forms - blanks
|
 |
Day-lighting foreign hot lines with H2S |
 |
Disposal of used engine oils. |
 |
Ditch Cave-ins |
 |
Do's and Don'ts - Suggested Hazard Identification Topics for Safety
Meetings
|
 |
Electric water pump safety - hazards using electrical water pumps |
 |
Emergency flow charts |
 |
Emergency phone lists |
 |
Employees requiring Transportation of Dangerous Goods (TDG) training and
certification |
 |
Ethyl Ether cold start equipment hazards
|
 |
Fire extinguisher inspection |
 |
Fire extinguisher maintenance |
 |
Fire response plan |
 |
Foreman's project Safety Reference Handbook |
 |
Foreman's Safety Performance re: documentation and training |
 |
Foreman's Safety Reference Handbook acknowledgement form
|
 |
Guidelines To Facilitate Compliance With the Transportation of Dangerous
Goods Act and Regulations on a Pipeline Construction Project
|
 |
H2S Potential Exposure - Safe Work Procedure |
 |
Hard Hat classification information sheet |
 |
Hazardous Waste Management Plan |
 |
Hazards associated with workers operating Hydraulic
Side booms |
 |
Hazards in welding shacks and electric pumps |
 |
Heights of Equipment - passage under overhead utilities |
 |
Hooking up of tractors to vehicles and equipment to pull them through the
mud. |
 |
Hotline excavation procedure
|
 |
Induced magnetism and it's effect on welding |
 |
Induced voltage hazard to workers |
 |
Induced voltage in pipe close to electrical transmission lines |
 |
Injury investigation form |
 |
Injury statistics - an explanation |
 |
Installing propane heaters under a hoarding |
 |
Internal Repairs - Safety Concerns, hazard assessment and equipment
checklist |
 |
Internal Welding Procedure |
 |
Internal welder CO and gas monitors
|
 |
Job hazard analysis - critical hazard control |
 |
Lifting device log books for Hoes and Booms |
 |
Lightening hazards
|
 |
Material Weights - pipe: wall thickness, weight, length; ditch slabs, test
heads, road slabs, valves, valve assemblies, bolt on weights, saddle weights |
 |
Mitigation of induced voltage chart - date, time, location, pipe to ground
potential |
 |
Mobile crane competency exam |
 |
Monthly Safety Summary form |
 |
Monthly summary of worker injuries
|
 |
Notice of Safety Violation - corrective action
|
 |
Orientation Employee information form, documenting training and
certification, identification of serious medical conditions
|
 |
Pigging process harmful chemical, PCB toxins and byproducts |
 |
Pipeline entry high risk procedure |
 |
Pipeline entry low risk procedure |
 |
Pipeline truckers walk-around checklist and hazards |
 |
Powerline Line Heights list: Shoofly road, chainage, volts kva, phase to
phase, Voltage to ground, limit of approach, height of wire, clearance under
goal post guard rope. |
 |
Powerline hazard - Electrical Arcing in Air |
 |
Powerline hazards - Working near powerlines |
 |
Procedure for entry into bore casing |
 |
Procedure for hot tapping |
 |
Procedure for Locating/Excavating Underground Pressurized Pipelines &
Foreign Line Crossings |
 |
Procedure for safe handling of methanol during testing activities -
filling and draining fabrication piping. |
 |
Procedure for suspending equipment over a steep slope to grade, excavate
and lay pipe.
|
 |
R.O.W. inspection checklist form |
 |
R.O.W. mud and resulting common injuries |
 |
Railroad crossings- minimum site-line requirements |
 |
Refueling and Static Electricity |
 |
Respirator approved cartridges for coating crew inhalation hazards |
 |
Respiratory protection procedures and implementation |
 |
Rigging database |
 |
Rigging guidelines when shortening up stringing pole trailers for long
hauls |
 |
Rigging of lifting devices relevant to Pipeline Construction |
 |
Roll over protective structures
|
 |
Safe Work Permit forms |
 |
Safe Work Practice - First Aid Personnel - Blood Exposure Protocol |
 |
Safe Work Procedure - Potential Exposure to H2S |
 |
Safe work procedure for excavating buried utilities |
 |
Safe work procedure for installing propane heaters under hoarding at test
points |
 |
Safety concerns when workers working in proximity to
|
 |
Safety Guide for the prevention of Radio Frequency radiation hazards in
the use of electric blasting caps |
 |
Sandblasters breathing air - guidelines |
 |
Sandblasting safety |
 |
Scaffolds - Do's & Don'ts |
 |
Scott Air Pak - operating and maintenance instructions |
 |
Sheet piling and temporary structures in pipeline construction |
 |
Signs: R.O.W. Rules |
 |
Signs: Watercourse Warning |
 |
Signs: Yard Cylinder Dock Rules |
 |
Slings - calculating the load on each leg of a sling |
 |
Slings - determining sling loading |
 |
Slings - Steel chain slings - working load limits |
 |
Slings - Synthetic web slings - material handling/working load limits |
 |
Slings - Wire rope slings - material handling/working load limits |
 |
Spill Management - Mechanics, service truck and fuel truck drivers |
 |
Spill Report Form |
 |
Spills - prevention/clean up/reporting |
 |
Static Electricity and Fuels Hazard Alert |
 |
Summer - Heat stress specific hazards |
 |
Supervisory Audit |
 |
Supplied breathing air safety
|
 |
Tips for the ATV rider |
 |
Traffic Control training |
 |
Trucking - glossary of trucking terms
|
 |
Use of Methyl Hydrate to clear ice - frozen moisture - out of Sandblasters
supplied air-breathing lines. |
 |
Use of oxygen in life support - estimating time duration of bottle sizes |
 |
Utility depths and locations - Line list of critical crossing hazards for
field supervisors
|
 |
Warehouse Wall Notice: Dangerous Goods authorization from warehouseman is
required before transporting or loading - note in the guidelines the
exceptions for carrying small quantities of Gasoline, Diesel, propane,
acetylene & oxygen. |
 |
Weekly environmental response plan identifying materials, crew and
equipment |
 |
Welding inside the pipe - Carbon Monoxide monitoring |
 |
Workplace Hazardous Materials Information System (WHMIS) Site specific
training schedule - identification of hazardous products, their use and
location on the R.O.W. |
 |
Wildlife Rabies - What you should know |
 |
Winter - Cold weather specific hazards - Do's and Don'ts |
 |
Winter hazards specific to pipeline construction equipment |
|